Inspection History: SITE - SEWER
Permit Number - T08PL00108
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/16/2008 | SITE - SEWER | Approved | IVRS - Inspection :* | |
11/20/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* MANHOLE #5 VACUUM TEST OK HCS CONNECTIONS TO BLD. OK CONTRACTOR IS REQUIRED TO KEEP MANHOLE #5 COMPLETELY PLUGGED ON SEWER INLETS & OUTLETS AND PULL PLUGS WITH INSPECTOR ON SITE WITH PUMP AVAILABLE TO PUMP ANY AND ALL LIQUID THAT MIGHT BE IN THIS PIPING WITH PCDEQ AUTHORIZATION TO DISCHARGE RELEASE FORM DUE TO CONSTRUCTION PROCESS |
|
11/19/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MANHOLE #5 TO EXISTING AT KOLB RD. AIR TEST 8" SDR 35 OK 1. MUST DISCONNECT 4" HCS ON NORTHWEST SEWER UNTIL AUTHORIZATION TO DISCHARGE IS OBTAINED FROM PCDEQ |
|
11/12/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* WATER TEST ON INTERCEPTOR OK AIR TEST ON SEWER FROM INTERCEPTOR TO MH #5 AIR TEST ON SEWER FROM INTERCEPTOR TO MH #5 2" YARD WATER FROM MAIN TO BUILD AT COL. GD |
|
11/10/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
11/06/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* REPAIR ALL LEAKS ON SAND/OIL INTERCEPTOR |
|
11/05/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* OK GIVEN TO MAKE CONNECTIONS TO SAND/OIL SEPARATOR WITH WATER TEST ON INTERCEPTOR AND CONNECTIONS TO BLD. UPSTREAM OF INTERCEPTOR AFTER INSPECTIONS OF BLD. HCS UPSTREAM OF INTERCEPTOR. SAND/OIL INTERCEPTOR TO BE PUMPED EMPTY AFTER TEST. 4" PVC SCH 40 OK TO COVER FROM SAND/OIL INTERCEPTOR TO 90 DEG. TURN TO NORTH ONLY FOR CONSTRUCTION CROSSING |
|
11/04/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" SDR 35 CONTINUES THRU CLEANOUT #5 AND #6 WITH ADDITION OF 4" HCS PER OWNER REQUEST TO NEW LAUNDRY AREA TO BE SHOWN ON REVISED APPROVED PLAN. TESTING AT LATER DATE. BEDDING, LAYING, TRACER OK |
|
10/30/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* MANHOLE #5 BASE POURED, PIPING CONTINUED TO MANHOLE #5 CONTINUES 8" WEST TO 7' FROM EXISTING PUBLIC MANHOLE. 6" CONTINUES FROM MANHOLE #5 NORTH APP. 20' BEDDING, LAYING, TRACER, SHADING |
|
10/29/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" SDR35 FROM 5' FROM INTERCEPTOR TRANSITION TO 40' SP-2000 DUCTILE IRON BACK TO SDR35 TURNS SOUTH APP. 20' TOWARD MANHOLE #5 BEDDING, LAYING, TRACER OK |
|
03/06/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* VACUUM TEST MANHOLE #1 OK VACUUM TEST MANHOLE #2 OK VACUUM TEST MANHOLE #3 OK |
|
03/05/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* TEST ON PIPING FROM MANHOLE #1 TO #2 OK TEST ON PIPING FROM MANHOLE #2 TO #3 OK |
|
03/04/2008 | SITE - SEWER | Partial Approval | CONTINUATION OF PIPING WITH DUCTILE IRON TO MANHOLE #2, BEDDING, LAYING, TRACER, MANHOLE #2 BASE POURED |
|
02/27/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 8" SDR 35 FROM MANHOLE #1 SOUTH APP. 160' BEDDING, LAYING, TRACER, POUR OF MANHOLE BASE #3 OK AIR TEST OF 6" SDR FROM JUNCTION WITH 4" BUILDING SEWER UPSTREAM OF SAND/OIL INTERCEPTOR THRU TO MANHOLE #3 OK |
|
02/26/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" SDR 35 FROM SAND/OIL INTERCEPTOR TO MANHOLE #3 INCLUDING 4" HCS STUB TO BUILDING AND 6" SEWER STUB FOR REDLINE FOR BUILDING SEWER FROM SOUTHEAST 6" SDR 13' STUB FROM MANHOLE #3 TO NORTH BEDDING, LAYING, TRACER |
|
02/25/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* EXCAVATION FROM SAND/OIL INTERCEPTOR TO NEW MANHOLE #3 |
|
02/14/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* AIR TEST FROM BLD HCS CAPS THRU C/04&3 TO SOIL SAND SEPARATOR OK |
|
02/13/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM BUILDING CONNECTION (2) TO INTERCEPTOR ON EAST SIDE 6" DUCTILE & SDR35 BEDDING, LAYING, TRACER OK AIR TEST AT LATER DATE AND INSPECTION OF BLD. CONNECTION AT LATER DATE. WATER TEST INTERCEPTOR OK |