Permit: T08PL00046

Parcel: 14111002B


Addresses:

8300 E VALENCIA RD

Inspection Status: Approved

Inspection History: SITE - SEWER

Date Description Inspector Results Comments
08/26/2010 SITE - SEWER Approved IVRS - Inspection :*
08/05/2010 SITE - SEWER Partial Approval IVRS - Inspection :*
02/11/2010 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
1. NEED AUTHORIZATION TO DISCHARGE FROM PC DEQ
2. WOOD TERMINATION OR TRACER WIRES IN MANHOLES WITH CORRECT TERMINATION OF MANHOLE COVERS TO PIMA COUNTY & CITY OF TUCSON STANDARDS
10/23/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
RETEST MANHOLE #3 OK
#7 OK
#8 OK
#10 OK
10/13/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
VACUUM TESTING MANHOLES
#2 - OK
#3 - FAILED
#4 - OK
#5 - OK
#6 - OK
#7 - FAILED
#8 - FAILED
#9 - OK
#10 - FAILED
#11 - OK
10/07/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
VACUUM COMPRESSOR BROKEN, NO THIRD PARTY INSPECTOR ON SITE
09/23/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
AIR TEST 6" BCS's FROM MANHOLE #3 TO C.O. #1 & #2 OK
FROM MANHOLE #4 TO C.O. #3 OK
MANHOLE #5 TO C.O. #4, #5, #6 OK
MANHOLE #5 TO C.O. #7 & C.O #8 OK
MANHOLE #8 TO C.O. #9 OK
MANHOLE #9 TO C.O. #10, #11, #12 OK
MANHOLE #10 TO C.O. #13 OK
4" BCS MANHOLE #11 TO C.O. #14 OK
09/19/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED
09/18/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
AIR TESTING - 8" SEWER FROM EXISTING PIMA COUNTY MANHOLE TO MANHOLE #1 OK
MANHOLE #1 TO #2 OK
MANHOLE #2 TO #3 OK
MANHOLE #3 TO #4 OK
MANHOLE #4 TO #5 OK
MANHOLE #5 TO #6 OK
MANHOLE #6 TO #7 OK
MANHOLE #7 TO #8 OK
MANHOLE #8 TO #9 OK
MANHOLE #8 TO #10 OK
MANHOLE #10 TO #11 OK

NEED TEST ON HCS LATERALS, VACUUM TESTING ON MANHOLES AND PCDEQ AUTHORIZATION TO DISCHARGE PRIOR TO HCS CONNECTION TO BLD.
09/17/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
1. 8" SDR FROM MANHOLE #10 TO #11
2. 6" FROM MANHOLE #10 TO BLD #10
3. 4" DUCTILE TRANSITION TO SDR35 FROM
MANHOLE #11 TO BLD. #19
4. MANHOLE #10 & MANHOLE #11 BASES POURED
5. BEDDING TRACER, SHADING
6. 6" SDR35 FROM MANHOLE #8 TO BLD. #6
7. 6" FROM MANHOLE #5 TO BLD. #3 AND BLD. #4
09/16/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED
09/12/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
1. SDR 35 FROM MANHOLE #8 TO #10
BEDDING & TRACER WIRE OK
TO BE TESTED AT LATER DATE
2. MANHOLES #1 & #2 POUR BACK TRACER WIRE AT TOP
09/11/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
GATE LOCKED NO ONE ON SITE
09/10/2008 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
09/09/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
1. 3-STUB FROM MANHOLE #9 SDR35
TRACER WIRE AND BEDDING OK
NO TEST AIR TEST TO BE DONE AT LATER DATE
09/05/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
MANHOLE BASE #9 CORRECTED
6" SDR 35 FROM MANHOLE #3 TO BLD. #1
MANHOLE #4 TO BLD. #2
MANHOLE #5 TO BLD. #5
09/04/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
MANHOLE BASES THRU #9 POURED & STACKED WITH HCS's AS REQUIRED. MANHOLE BASE #9 - 8" OUTLET IS REQUIRED TO NOT HAVE BELL END (FLEXIBLE CONNECTION) DIRECTLY EMBEDDED IN CONCRETE BASE.
8" SDR PIPING FROM PIMA COUNTY EXISTING THRU
MANHOLE #9 INCLUDING 8" STUB TOWARD MANHOLE #10
BEDDING, LAYING, TRACER, SHADING
PER REVISION (2) RWS 8/11/08
08/29/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR 35 CONTINUES TO MANHOLE #7 TO #8 AND STUBBED OUT OF #8
BEDDING, LAYING, TRACER, SHADING
MANHOLE BASES PER #6 AND #7 POURED
#8 POURED WITH 8" STUB NORTH, 8" STUB EAST
6" STUB WEST
08/28/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR CONTINUES TO MANHOLE #6 GOES EAST APP. 100'
BEDDING, LAYING, TRACER, SHADING
08/26/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR CONTINUES TO 15' FROM MANHOLE #6
08/25/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
MANHOLE #3 & #4 STACKED
8" SDR 35 CONTINUES TO MANHOLE #5
CONTINUOUS NORTH APP. 100' SOUTH OF MANHOLE #6
BEDDING, LAYING, TRACER, SHADING
08/22/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
MANHOLE #1 & #2 STACKED
MANHOLE #3 & #4 ARE POURED WITH 6" HCS STUBS INSTALLED, 8" SDR 35 CONTINUOUS NORTH FROM
MANHOLE #4 APP. 120' TOWARD MANHOLE #5
ENGINEER TO PROVIDE A PLAN THAT IS READABLE WITH DETAILS THAT ARE READABLE AND A SIZING CHART FOR ALL BUILDING HCS LATERALS.
08/21/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
CONTINUATION OF 8" SDR35 TO MANHOLE #3, CONTINUES WEST TO MANHOLE #4, CONTINUES AIP 80' NORTH TOWARD MANHOLE #5 -- BEDDING, LAYING, TRACER OK
08/19/2008 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR CONTINUES TO MANHOLE #2, FROM #2 TO #3
TRANSITION TO DUCTILE IRON BACK TO SDR 35 CONTINUES
TO APP. 40' FROM MANHOLE #3 BEDDING, LAYING, TRACER WIRE SHADING. BASE OF MANHOLE #1 & #2 POURED
08/13/2008 SITE - SEWER Partial Approval 8" SDR 35 FROM EXISTING PIMA COUNTY MANHOLE TO REVISED NEW MANHOLE #1 - BEDDING, LAYING, TRACER OK
TO SHADE AND START BACKFILL WITH 3RD PARTY INSPECTOR OK

8" SDR 14' OUT OF MANHOLE #1 HEADING NORTH