Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/04/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. GAS PRESSURE SYSTEM TO BE TIED TOGETHER AT SERVICE ENTRY AND TESTED IN ITS ENTIRETY 2. ALL UNDERGROUND FITTINGS AND TOOL MARKS TO BE PRIMED THEN DOUBLE TAPED TO MEET 40 MIL THICKNESS 3. LIST NOT COMPLETE, NEED AN ADULT PRESENT TO PROVIDE ACCESS AT TIME OF INSPECTION 4. ABOVE GRADE PIPING TO BE MINIMUM 3 1/2" ABOVE FINISH GRADE |