Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T08PL00018

Parcel: 117032910

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
01/07/2008 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
01/04/2008 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. GAS PRESSURE SYSTEM TO BE TIED TOGETHER AT SERVICE ENTRY AND TESTED IN ITS ENTIRETY
2. ALL UNDERGROUND FITTINGS AND TOOL MARKS TO BE PRIMED THEN DOUBLE TAPED TO MEET 40 MIL THICKNESS
3. LIST NOT COMPLETE, NEED AN ADULT PRESENT TO PROVIDE ACCESS AT TIME OF INSPECTION
4. ABOVE GRADE PIPING TO BE MINIMUM 3 1/2" ABOVE FINISH GRADE