Inspection Status: Approved
Inspection History: SIGN EXCAVATION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2008 |
SIGN EXCAVATION |
|
Approved |
THE FOOTING NEEDS TO BE 1.50 X 3 - WILL ALLOW THE ADDITIONAL 6 INCHS OF FILL TO BE REMOVED BEFORE CONCRETE IS POURED. SETBACK OF SIGNS PER APPROVED PLANS. |
| 08/21/2008 |
SIGN EXCAVATION |
|
Not ready for Inspection |
IVRS - Inspection :* FTG AT 10TH STILL NOT 3' |
| 08/18/2008 |
SIGN EXCAVATION |
|
Not ready for Inspection |
IVRS - Inspection :$ FOOTINGS AT 10TH WERE 12" & 8"; AND PLUMER FOOTINGS AT PLUMER NOT 2.5 AND WHICH IS CORR SETBACK- 25' OR 27'? |