Inspection History Details
Inspection Status: Approved
Inspection History: CERTIFICATE OF OCCUPANCY
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2008 | CERTIFICATE OF OCCUPANCY | Approved | IVRS - Inspection :* | |
| 07/02/2008 | CERTIFICATE OF OCCUPANCY | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL EXTERIOR ELECTRICAL OUTLETS AND JUNCTION BOXES TO BE PROPERLY COVERED 2. ACCESSIBLE DOOR HARDWARE REQUIRED ON RESTROOMS 3. NO KNOWLEDGE HARDWARE (UNLOCKS FROM EGRESS SIDE WHEN HANDLE TURNED) REQUIRED ON ALL SUITES 4. INSTALL EXIT SIGNS (ILLUMINATED) 5. REMOVE PANIC HARDWARE FROM SECONDARY EXITS 6. SIGN OVER SUITE ENTRANCES "THIS DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED" 7. YOU MUST PROVIDE WORKING SPACE AROUND THE ELECTRIC SERVICE PER THE NEC (NEW SERVER MUST BE RELOCATED OUT OF ELEC. ROOM |