Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 11/13/2008 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEAL CEILING OF EXISTING FURNACE ROOM 2) PAINT CONDENSATE DRAIN 3) PROVIDE LOAD CALCS FOR ADDED LOAD OF A/C UNIT IN MAIN PANEL TO BE SOME COLOR OTHER THAN WHITE FOR POWER AND GREEN FOR GROUND OR BARE 5) USE GROMMET OR OTHER APPROVED DEVICE TO PROTECT WIRE FROM DISCONNECT INTO UNIT 6) WHAT SIZE WIRE USED ? #6 REQUIRED FOR 60 AMPS 7) STRUCTUAL (BLDG) PERMIT REQUIRED FOR ROOF LOAD OF A/C UNIT |