Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2008 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE |
|
| 02/01/2008 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 01/31/2008 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 01/25/2008 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 8 PSI TEST IS OK ON GAS PIPE NO REQUIRED DRAWING ON SITE CANNOT CONFIRM R8 DUCT LINER, 1" WAS USED R4.2 OK TO TURN ON GAS |
|
| 01/18/2008 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - AC UNIT OVERFUSED - IMPROPER ELEC. FITTINGS USED OUTDOORS - CONDENSATE NOT SUPPORTED EVERY 4', NOT PAINTED WITH LATEX PAINT, TERMINATE WITHIN 6" OF THE GROUND WITH ELBOW & NIPPLE - PROVIDE A GAS PRESSURE TEST ON ALL NEW GAS PIPING - SECURE THE A/C STAND TO THE ROOF - PROVIDE THE REQUIRED DRAWING APPROVED BY CITY OF TUCSON FOR STRUCTURAL SUPPORT OF ROOF FOR NEW UNIT - PROVIDE 2" DUCT LINER IN EXPOSED DUCT ON ROOF - PROVIDE THE GFI SERVICE RECEPTACLE ON ROOF |