Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2009 | INSP - FULL | Approved | APPROVED BY FIELD INSPECTION | |
| 12/30/2008 | INSP - FULL | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED DURING THE SCHEDULED REMODEL. 1) GUAGES AT THE SPRINKLER RISER ARE DUE FOR THE 5 YEAR CALIBRATION OR TO BE CHANGED OUT 2) ALL LOADED SPRINKLER HEADS AND THOSE WITH BENT DEFLECTORS SHALL BE CHANGED OUT. 3) A SPRINKLER HEAD NEEDS TO BE ADDED TO A CORNER BOOTH |