Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
Case Number - T08FR04809
Inspection Description - VIOL - BUILDING SVCS & SYSTEMS
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/26/2008 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | TFC 605.4.3 - Installation. Relocatable power tap cords shall not extend through walls, ceilings, floors, under doors or floor coverings, or be subject to environmental or physical damage. TFC 605.5 - Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor coverings, nor shall such cords be subject to environmental damage or physical impact. Extension cords shall be used only with portable appliances. _____ Power cord through ceiling. |