Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2009 | INSP - FULL | Approved | ||
| 02/10/2009 | INSP - FULL | Correction Required | SECOND NOTICE THIS OFFICE HAS NOT RECEIVED A REPORT OF COMPLIANCE FOR THE NOTICE DATED 12-15-2008, FOR THE ABOVE LISTED DEFICIENCIES CONCERNING THE FIRE PROTECTION SYSTEM AT 505 N. ALVERNON. IF CORRECTED, HAVE THE CONTRACTOR OF RECORD FORWARD THEIR REPORT. |
|
| 12/15/2008 | INSP - FULL | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE FORWARDED TO THIS OFFICE 1) THE SPRINKLER VALVE IS DUE FOR THE 5 YEAR INTERNAL INSPECTION 2) THE LOCK AND CHAIN SHALL BE SECURED ON THE CONTROL VALVE. |