Inspection History Details
Inspection Status: Continued
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2009 | INSP - FULL | Continued | REFEERED TO CAPT. CARLTON FOR FULL BUSINESS INSPECTION AND SPRINKLER ANNUAL. NEW GUILD WORKSHOP IS A WOOD WORKING FACILITY. | |
| 02/10/2009 | INSP - FULL | Correction Required | SECOND NOTICE THIS OFFICE HAS NOT RECEIVED A REPORT OF COMPLIANCE FOR THE NOTICE DATED 12-8-2008, FOR THE ABOVE LISTED DEFICIENCY CONCERNING THE FIRE PROTECTION SYSTEM AT 610 N. 9TH. AV. IF CORRECTED HAVE THE CONTRACTOR OF RECORD FORWARD THEIR REPORT. |
|
| 12/08/2008 | INSP - FULL | Correction Required | FIRE SPRINKLER SYSTEMS ARE REQUIRED TO BE TESTED ON AN ANNUAL BASIS. ACCORDING TO THE LAST REPORT RECEIVED FOR "610 N. 9TH. AVE" , THE INSPECTION WAS DONE IN 2003. A COPY OF A CURRENT FLOW TEST SHALL BE FORWARDED TO THIS OFFICE WITH IN 30 DAYS. |