Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FULL
Case Number - T08FR04534
Inspection Description - INSP - FULL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/23/2008 | INSP - FULL | Approved | *** NOTE ITEM # 2 FROM THE WRITE UP IS BEING TRANSFERED TO A NEW REPORT FOR SUITE # 110 AT 4500 E. SPEEDWAY. THE DESTINY CHURCH INTERNATIONAL. |
|
12/02/2008 | INSP - FULL | Correction Required | 8) MAMAS PIZZA - THE BOTTOM GUAGE SHALL BE SHANGED OUT FOR A CORRECT READING. A NEW PRESSURE READING SHALL BE PROVIDED THIS OFFICE | |
12/02/2008 | INSP - FULL | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE FORWARDED TO THE FIRE PREVENTION OFFICE. 1) THE FIRE DEPARTMENT CONNECTION IS MISSING PROTECTIVE CAPS AND GASKETS, BOTH SHALL BE REPLACED 2) CHURCH - NO ITEMS SHALL BE HUNG FROM SPRINKLER PIPING. REMOVE SPEAKERS AND WIRING. 3) PROVIDE 2, 200 DEGREE 1/2 " STANDARD UPRIGHT SPRINKLERS AT THE HEAD BOX. 4) STARVING STUDENTS - PROVIDE SPRINKLER COVERAGE TO THE OFFICE 5) CHURCH - PROVIDE SPRINKLER COVERAGE TO THE CLOSET BY THE KITCHEN 6) VENTURES SUITE - PROVIDE SPRINKLER COVERAGE TO THE FRONT OFFICES 7) IF THE CONTROL VALVE IS NOT IN A SECURE AREA A LOCK AND CHAIN SHALL BE PROVIDED |