Case: T08FR04455

Parcel: 13313006M


Addresses:

7699 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: INSP - FULL

Date Description Inspector Results Comments
07/06/2009 INSP - FULL Approved CONTRACTORS REPORT TO SYSTEMS
06/22/2009 INSP - FULL Correction Required ACCORDING TO OUR RECORDS THE FOLLOWING ITEMS ARE STILL IN NEED OF BEING ADRESSED AS DEFICIENCIES TO THE FIRE PROTECTION SYSTEM:

1) THE GUAGES ARE DUE FOR REPLACEMENT OR RECALIBRATION

2) THE CHECK VALVE AT THE SPRINKLER RISER IS DUE FOR A 5 YEAR INTERNAL INSPECTION

PLEASE REFEER TO THE NOTICE SENT AND DATED 12-9-2008.
THANK YOU FOR YOUR ATTENTION TO THIS MATTER, AND FORWARD A COPY OF THE REPAIR ORDER WITH IN 30 DAYS
12/09/2008 INSP - FULL Correction Required DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORECTED WITH IN 30 DAYS. A COPY OF THE REPAIR ORDER SHALL BE FORWARDED TO THIS OFFICE

1) IF THE CONTROL VALVE IS NOT IN A SECURE AREA IT SHALL BE SECURED WITH A LOCK AND CHAIN

2) GUAGES ARE DUE FOR REPLACEMENT OR RECALIBRATION

3) CHECK WITH THE SPRINKLER CONTRACTOR TO FIND OUT IF THE CHECK VALVE IS DUE FOR THE 5 YEAR INTERNAL INSPECTION
11/26/2008 INSP - FULL Correction Required FIRE PROTECTION SYSTEMS " SPRINKLERS " ARE REQUIRED TO BE TESTEN ON AN ANNUAL BASIS. WHEREAS THIS OFFICE DOES NOT HAVE A CURRENT REPORT OF INSPECTION, LAST ON RECORD IS FOR 2004, A COPY SHALL BE FORWARDED TO THE FIRE PREVENTION OFFICE WITH IN 30 DAYS.