Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2008 | INSP - FULL | Approved | ||
| 11/20/2008 | INSP - FULL | Correction Required | DURING THE ANNUAL FIRE SPRINKLER INSPECTION THE FOLLOWING DEFICIENCIES WERE FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE FORWARDED TO THIS OFFICE 1) THE SPRINKLER RISER IS DUE FOR THE 5 YEAR INTERNAL VALVE INSPECTION 2) THE SPARE HEAD BOS NEEDS A SPECIAL WRENCH FOR CHANGING SPRINKLER HEADS 3) IF THE MAIN CONTROL VALVE IS NOT IN A SECURE AREA, THE CONTROL VALVE SHALL BE SECURED WITH A LOCK AND CHAIN 4) THE SUPPLY GUAGE WAS DAMAGED, IT SHALL BE REPLACED AND A FLOW TEST PERFORMED FOR REQUIRED PRESSURE READINGS. 5) A 3 FOOT CLEARANCE SHALL BE PROVIDED AT THE SPRINKLER RISER FOR ACCESSABILITY |