Case: T08FR03792

Parcel: 117030170


Addresses:

645 E UNIVERSITY BL


Inspection Status: Approved

Inspection History: VIOL - MEANS OF EGRESS

Case Number - T08FR03792

Inspection Description - VIOL - MEANS OF EGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
12/02/2008 VIOL - MEANS OF EGRESS Approved REFFERRED TO DNR. DNR ORDERED 3RD FLOOR TO BE USED AS STORAGE ONLY. 3RD FLOOR IS NOT TO BE USED AS BEDROOMS. COFO ALSO ORDERED BY DNR. FIRE INSPECTION IS APPROVED.
10/16/2008 VIOL - MEANS OF EGRESS Violation 1026.1 General. In addition to the means of egress required by
this chapter, provisions shall be made for emergency escape
and rescue in Group R and I-1 occupancies. Basements and
sleeping rooms below the fourth story above grade plane shall
have at least one exterior emergency escape and rescue opening
in accordance with this section. Where basements contain one
or more sleeping rooms, emergency egress and rescue openings
shall be required in each sleeping room, but shall not be
required in adjoining areas of the basement. Such openings
shall open directly into a public way or to a yard or court that
opens to a public way.

____Each bedroom needs an emergency escape. Currently the bedrooms upstairs do not have windows. This was once an open room. The bedrooms were built without permits. This is being referred to DNR. Fire will follow up.
____Remove the board from outside of bedroom window. Basement bedroom, East side. This window must operate properly and not be "boarded up" if this room is used as a bedroom or room for sleeping purposes.