Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T08FR03178

Parcel: 10504136B


Addresses:

555 E RIVER RD


Inspection Status: Approved

Inspection History: INSP - FULL

Case Number - T08FR03178

Inspection Description - INSP - FULL

Inspection Status - Approved

Date Description Inspector Results Comments
11/21/2008 INSP - FULL Approved
10/13/2008 INSP - FULL Correction Required DURING THE ANNUAL SPRINKLER INSPECTION AT 555 E. RIVER, THE FOLLOWING DEFICIENCIES WERE DISCOVERED AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE CORRECTION REPORT SHALL BE MAILED TO THIS OFFICE.

1) GROUND FLOOR JANITORS CLOSET, REPLACE MISSING CEILING TILES.

2) PROVIDE A HYDRAULIC CALCULATION PLATE AT THE SPRINKLER RISER.

3) PROVIDE A IDENTIFICATION SIGN AT THE INSPECTORS TEST

4) PROVIDE A HEAD WRENCH FOR GEM/VICTOLIC 27 SPRINKLER HEADS

5) PROVIDE THE REQUIRED SPARE HEADS AT THE HEAD BOX,
2-HORIZONTAL SIDEWALL 155 DEGREE HEADS
2-STANDARD 155 DEGREE PENDANT HEADS

6) CLASSROOM # 102, RELOCATE THE POWER POLE THAT IS OBSTRUCTING A SPRINKLER

7) RECEPTION ROOM- THE WALL THAT WAS ADDED IS OBSTRUCTING SPRINKLER COVERAGE, ONE SHALL BE ADDED

8) ADD SPRINKLER PROTECTION TO THE ELEVATOR MECHANICAL ROOM

9) GROUND FLOOR LADIES ROOM LACKS SPRINKLER COVERAGE, SPRINKLERS SHALL BE ADDED

10) ADD SPRINKLER COVERAGE IN THE NEW OFFICE

11) ADMINISTRATION NEEDS TO HAVE A SPRINKLER RELOCATED

11) REPLACE THE SUPPLY SIDE GUAGE AT THE SPRINKLER RISER IF NECESSARY


2-STANDARD 155 DEGREE UPRIGHT HEADS
09/26/2008 INSP - FULL Correction Required sprinkler test full inspection required