Inspection Status: Approved
Inspection History: INSP - FULL
Case Number - T08FR03178
Inspection Description - INSP - FULL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2008 | INSP - FULL | Approved | ||
10/13/2008 | INSP - FULL | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION AT 555 E. RIVER, THE FOLLOWING DEFICIENCIES WERE DISCOVERED AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE CORRECTION REPORT SHALL BE MAILED TO THIS OFFICE. 1) GROUND FLOOR JANITORS CLOSET, REPLACE MISSING CEILING TILES. 2) PROVIDE A HYDRAULIC CALCULATION PLATE AT THE SPRINKLER RISER. 3) PROVIDE A IDENTIFICATION SIGN AT THE INSPECTORS TEST 4) PROVIDE A HEAD WRENCH FOR GEM/VICTOLIC 27 SPRINKLER HEADS 5) PROVIDE THE REQUIRED SPARE HEADS AT THE HEAD BOX, 2-HORIZONTAL SIDEWALL 155 DEGREE HEADS 2-STANDARD 155 DEGREE PENDANT HEADS 6) CLASSROOM # 102, RELOCATE THE POWER POLE THAT IS OBSTRUCTING A SPRINKLER 7) RECEPTION ROOM- THE WALL THAT WAS ADDED IS OBSTRUCTING SPRINKLER COVERAGE, ONE SHALL BE ADDED 8) ADD SPRINKLER PROTECTION TO THE ELEVATOR MECHANICAL ROOM 9) GROUND FLOOR LADIES ROOM LACKS SPRINKLER COVERAGE, SPRINKLERS SHALL BE ADDED 10) ADD SPRINKLER COVERAGE IN THE NEW OFFICE 11) ADMINISTRATION NEEDS TO HAVE A SPRINKLER RELOCATED 11) REPLACE THE SUPPLY SIDE GUAGE AT THE SPRINKLER RISER IF NECESSARY 2-STANDARD 155 DEGREE UPRIGHT HEADS |
|
09/26/2008 | INSP - FULL | Correction Required | sprinkler test full inspection required |