Case: T08FR03036

Parcel: 11615082A

Inspection Status: Approved

Inspection History: INSP - FULL

Case Number - T08FR03036

Inspection Description - INSP - FULL

Inspection Status - Approved

Date Description Inspector Results Comments
07/15/2009 INSP - FULL Approved CONTRACTORS CORRECTION REPORT TO SYSTEMS
06/19/2009 INSP - FULL Correction Required DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE REPAIRED WITH IN 30 DAYS. A COPY OF THE REPAIR ORDER SHALL BE FORWARDED TO THIS OFFICE.

1) THE WATER MOTOR GONG FAILED, IT SHALL BE REPAIRED OR REPLACED. PIPING SHALL BE FLUSHED IF NECESSARY.

2) A SPRINKLER HEAD OUTSIDE OF THE HOOD SYSTEM IS GREASE LOADED AND SHALL BE CHANGED OUT.
09/23/2008 INSP - FULL Correction Required sprinkler test full inspection required