Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
Case Number - T08FR02722
Inspection Description - VIOL - BUILDING SVCS & SYSTEMS
Inspection Status - Correction Required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2008 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | 605.4.1 Power tap design Relocatable power taps shall be of the polarized or grounded type, equipped with overcurrent protection, and shall be listed in accordance with UL 1363. _____ Remove the power tap adapter from the ceiling outlet in the main lobby. |