Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: VIOL - MEANS OF EGRESS
| Date |
Description |
Inspector |
Results |
Comments |
| 10/13/2008 |
VIOL - MEANS OF EGRESS |
|
Approved |
|
| 08/12/2008 |
VIOL - MEANS OF EGRESS |
|
Violation |
TFC 1006.1 Instal Emergency Egress lighting kits (4): south dining area, north dining area, main bar area and kitchen. |
| 08/12/2008 |
VIOL - MEANS OF EGRESS |
|
Violation |
TFC 1008.1 Remove double cylinder dead bolts and replace with thumb bolts on the egress side @ all doors w/in the path of egress: Both doors leading to the outside from the kitchen (incl security gates), @ Rincon 4 dining area, both doors (leading to atrium) in north banquet room, and @ workshop/storage door at south end of bldg. Also, remove padlock from courtyard gate. |
| 08/12/2008 |
VIOL - MEANS OF EGRESS |
|
Violation |
TFC 1011 Remove "Not an Exit" sign @ north end of bar and replace w/ "Use Other Door / Patio Only" sign. Remove "Not an Exit" sign from west kitchen door and replace with "Use Other Door" (w/ arrow "<----") Also, install "Patio Only" sign @ north door of north banquet room. Also, install "Employees Only" sign @ kitchen, from restroom hallway. |
| 08/12/2008 |
VIOL - MEANS OF EGRESS |
|
Violation |
TFC 1011 Repair illuminatin of ALL exit signs; both double sided signs in atrium, @ south end of atrium. Also, remove vegetation blocking northeast exit sign in atrium. |
| 08/12/2008 |
VIOL - MEANS OF EGRESS |
|
Violation |
TFC 1011 Install exit signs (5); @ both doors to atrium from north banquet room, at both doors from south banquet room and @ south exit hallway in kitchen area (visible from kitchen). |