Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T08FR01666

Parcel: 107031800

Inspection Status: Approved

Inspection History: INSP - FULL

Date Description Inspector Results Comments
08/15/2008 INSP - FULL Approved
06/23/2008 INSP - FULL Correction Required 1) tHE FFIRE ALARM PULL STATION IN THE WAREHOUSE SHALL BE REPAIRED

2) pANIC HARDWARE WHERE INSTALLED SHALL BE THE ONLY LOCKING DEVICE. THE SLIDING BOLT AHALL BE REMOVED

3) fIRE EXTINGUISHERS SHALL BE SERVICED ANNUALLY AND HUNG FOR ACCESSABILITY

4) a FLUE SPACE SHALLO BE MAINTAINED BETWEEN STORAGE ON RACKS

5) sPRINKLER PROTECTION SHALL BE ADDED TO THE UNDERSIDE OF THE NEW MEZZANENE. sUBMITTALS AND PERMITS REQUIRED. sUBMITTALS SHALL BE MADE WITHIN 14 DAYS. IF SPRINKLERS ARE NOT INSTALLED, ALL COMBUSTABLE MATERIALS SHALL BE REMOVED FROM THE UNDERSIDE

5) SRINKLER PROTECTION SHALL BE ADDED TO THE REST OF THE BUILDING, OR THE RATED WALL THAT WAS REMOVED SHALL BE ENCLOSED WITH A RATED ASSEMBLY, MINIMUM 1 HOUR. ALSO THE WINDOW IN THE WAREHOUSE OFFICE SHALL HAVE A 1 HOUR RATING

6) EMERGENCY LIGHTING SHALL BE TESTED TO ASSURE THAT IT IS WORKING

7) THE CENTER DOOR IN THE WAREHOUSE THAT IS BLOCKED BY RACKS SHALLBE SIGNED 'NOT AN EXIT', AND EXIT SIGNAGE SHALL BE PROVIDED TO THE WAREHOUSE SIDE OF THE DOOR LEADING TO THE EXTERIOR DOORWAY AND AT THE BOTTOM OF THE STAIRS 'EXIT'

7) EXIT SIGNS SHALL BE ILLUMINATED AT ALL TIMES

8) THE SPRINKLER WATER MOTOR GONG SHALL BE IN REPAIR

9) PROVIDE 3, 1/2 INCH UPRIGHT STANDARD SPRINKLERS

10) pROVIDE SIGNAGE FOR THE MAIN DRAIN AND AND CONTROL VALVE, ALSO SECURE THE CONTROL VALVE