Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T08FR00188

Parcel: 12801005H

Inspection Status: Correction Required

Inspection History: INSP - FULL

Case Number - T08FR00188

Inspection Description - INSP - FULL

Inspection Status - Correction Required

Date Description Inspector Results Comments
02/06/2008 INSP - FULL Correction Required 703.1.2 Smoke barriers. Required smoke barriers shall be
maintained to prevent the passage of smoke and all openings
protected with approved smoke barrier doors or smoke
dampers.
___Replace ceiling tile
02/06/2008 INSP - FULL Correction Required 305.1 Clearance from ignition sources. Clearance between
ignition sources, such as luminaires, heaters, flame-producing
devices and combustible materials, shall be maintained in an
approved manner.
___Remove combustibles from water heater area.
02/06/2008 INSP - FULL Approved All items corrected. Jan. 31, 2008
01/17/2008 INSP - FULL Correction Required 605.3Working space and clearance. A working space of not less than 30 inches (762 mm) in width, 36 inches (914 mm) in depth and 78 inches (1981 mm) in height shall be provided in front of electrical service equipment. Where the electrical service equipment is wider than 30 inches (762 mm), the working space shall not be less than the width of the equipment. No storage of any materials shall be located within the designated working space.
___Maintain clearance in front of electrical panels