Inspection Status: Approved
Inspection History: INSP - AST/UST
| Date |
Description |
Inspector |
Results |
Comments |
| 02/05/2008 |
INSP - AST/UST |
|
Approved |
Tanks have a burm built up around them with hydro barriers on top of that. The tanks are approved for use. |
| 01/28/2008 |
INSP - AST/UST |
|
Continued |
Tank not ready for inspection. Storm water is requiring a plastic containment installed. The tanks are doubble wall. |
| 01/07/2008 |
INSP - AST/UST |
|
Continued |
SI- Tanks were to be installed 01-02-07. There is a delay in electrical plans. They should be installed next week. |