Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2009 | ELECTRIC - UNDERGROUND | Approved | IVRS - Inspection :* | |
| 02/13/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 02/09/2009 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CHANGE CONTR. OF RECORD TO CORRECT ELEC. CONTR. 2. #4 GROUND ELECTRODE CONDUCTOR TO TERMINATE IN LOAD SECTION WHERE NEUTRAL BAR IN PEDESTAL 250 NEC 3. CONDUIT DEPTH 24" FROM TOP OF CONDUIT TO FINISHED GRADE PER 300.5 NEC 4. USE BUSHED ENDS AT CONDUIT TERMINATIONS PER 300 NEC 5. MOST IMPORTANTLY, USE GLUE FOR PVC JOINTS 6. REMOVE BACK COVERS AT CONDUIT STUB-UPS AND FRONT COVERS TO INSP. GROUND CONNECTIONS |