Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2009 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) STILL NEED REVISED PLANS 2) RECALL WHEN PANEL TIED IN 3) NEED PANEL DIRECTORY |
|
| 05/20/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. PROPERLY INSTALL GROUND RODS 6' APART 2. INSTALL BOND DEVICES AT SERVICE NIPPLES AND RACEWAYS 250.92 3. SECURE GROUNDING ELECTRODE CONDUCTOR 4. INSTALL REJECTION PINS 5. IDENTIFY GROUNDING CONDUCTORS 250.119 6. SEAL ENTRANCES ABOVE CURRENT CARRYING PARTS 7. INSTALL ALL STRANDS OF CONDUCTORS UNDER TERMINAL LUGS 8. PLANS CALL FOR 3/4" GROUND RODS 9. REVISE PLANS TO WORK INSTALLED OR INSTALL AS PER PLANS |
|
| 04/30/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* |