Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2008 | ELECTRIC - FINAL | Approved | ||
| 09/26/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) FINISH #8 PREVIOUS INSPECTION |
|
| 09/22/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. ALL SERVICES IN AREA UNDERGROUND 2. USE LISTED MAST BRACE KIT 3. IDENTIFY NEUTRAL CONDUCTORS CLOSER TO WEATHERHEAD 4. PANEL CIRCUIT DIRECTORY TO BE AS PER 408.4 NO GENERAL LABELING AND NO ABBREVIATIONS 5. INSTALL SERVICE CONDUCTORS AS PER MANUFACTURES INSTRUCTIONS 6. MAINTAIN WIRE BENDING RADIUS 7. GROUNDING EQUIPMENT CONDUCTORS TO BE GREEN ENTIRE LENGTH 8. CORRECLTY IDENTIFY UNGROUNDED CONDUCTORS 9. SECURE CABLE TO JUNCTION BOX WITH APPROVED CONNECTORS 10. USE APPROVED & LISTED JUNCTION BOX - NOT OLD PANEL 11. CORRECTLY MAKE UP JUNCTION BOX |