Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* LIGHTING ONLY: 1) 24 INSTALL FLOURESCENT ON ENTRY BLDG 2) 1-1000 WATT ? FIXTURE ON BACK OF BLDG NORTH SIDE INSTALLED 3) 3-1000 WATT ? FIXTURES ON CANOPY #5 4) NOTE #10 CALLS FOR FULL CUT OFF FIXTURES. THEY ARE NOT 5) GROUNDING ELECTRODE SYSTEM AS PER PLANS NOT INSTALLED 6) LABEL PANELS AND CIRCUIT DIRECTORIES 7) BOXES OVER FILLED 8) UNDERGROUND INSTALLED WITHOUT INSPECTIONS-OPEN 4' FOR EVERY 20' OF TRENCH TO VERIFY 24" OF COVER 9) NEED OVER CURRENT PROTECTION AT MAIN PANEL NOT PASS THRU 10) PARTIAL INSPECTION |
|
| 12/04/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 12/03/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. HAVE CONTR. ON SITE TO OPEN EQUIP. FOR INSP. 2. NEED CORRESPONDING PLAN/PERMIT FOR THIS ACT.# |
|
| 11/28/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no plan or job inspection card on site.| 925* 1. COULD NOT FIND APPROVED PLAN FOR THIS ACTIVITY. LOOKED THROUGH 5 SETS OF PLANS ON SITE NONE MATCHED THIS ACTIVITY. NO INSPECTION DONE. |
|
| 11/21/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. PROVIDE APPROVED PLANS/PERMIT 2. NO COMPLIANCE WITH NOTE #7 (INSP. 10/24/08) 3. NO COMPLIANCE WITH NOTE #1, 2, 3, 4, 6 4. BACK FEED MAIN BRKR AT SUB-PANEL TO HAVE HOLD DOWN DEVICE PER NEC 5. A REINSPECTION FEE WILL BE ASSESSED NEXT INSPECTION IF NO COMPLIANCE |
|
| 11/21/2008 | ELECTRIC - FINAL | Partial Approval | OWNER REQUESTS AFTER HRS. PAID $150.00 CK#5594 - RETURN INSP. 1. USE PROPER HOLD DOWN HARDWARE FOR MAIN BREAKER AT SUB-PANEL AS SPECIFIED ON COVER 2. ONLY 1 GROUND WIRE PER ACORN GROUND CONNECTOR INSTALL CONDUCTOR PROPERLY 3. SEE PREVIOUS INSP. WIRE NOTES 4. OK CANOPY BRANCH WIRING. OK BOND JUMPER TO CANOPY 5. ADVISE TO HAVE ELECTRICIAN CONTR. ON SITE TO MEET W/INSPECTOR |
|
| 11/14/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BOND BLD. STEEL FOR CANOPY TO GROUNDING ELECTRODE SYSTEM PER 250 NEC 2. DISCONNECT BOND BETWEEN NEUTRAL BAR & EQUIP GROUND 3. NEED TO INSPECT WIRING METHODS FOR CANOPY SEE NOTE #7 LAST INSP. 4. BRANCH CIRCUITS GROUNDS & NEUTRALS TO BE COLOR CODED (CONTINUOUS) OUTER COVERING PER 200 & 250 NEC 5. WIRE NUTS NOT RATED FOR WET LOCATION IN PULL BOXES 6. METAL RACEWAYS FOR GROUNDING ELECTRODE CONDUCTOR TO HAVE BOND BUSHING AT ENDS 250.64E 7. SERVICE NOT PER PLAN 8. OPEN ALL GATE CABINETS FOR INSP. |
|
| 10/24/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CANNOT TERMINATE MULTIPLE GROUNDS UNDER ONE LUG 2. TIGHTEN LUGS ON BONDING BUSHINGS 3. NEED TO ADDRESS SERVICE 4. PLAN CALLS FOR CONDUCTORS TO BE XHHW 5. NEED GROUNDING ELECTRODE SYSTEM @ SUB-PANEL 6. GROUNDS AND NEUTRALS TO BE SEPARATE @ SUB-PANEL INSTALL GROUND BAR 7. COVERS FOR UNDERGROUND PULL BOXES TO BE MARKED "ELECTRIC" AND MEET REQUIREMENTS OF 314.30D 8. NEED MAIN DISCONNECTING MEANS @ SUB-PANEL NEC 225.31 |
|
| 07/16/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* INSTALL MAIN BONDING JUMPER IN SERVICE PANEL AT MODULAR, CALL IN UNDER CORRECT ACTIVITY |