Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2008 | INSP - INITIAL CODE ENFORCMENT | Approved | CONCRETE SLAB ON FRONT (EAST) RIGHT OF WAY AREA USED AS PATIO FOR ADDITIONAL SEATING (4 TABLES AND 26 CHAIRS PRESENT). SEATING BEYOND WHAT WAS APPROVED ON LAST SITE PLAN ON FILE (6/25/2001) REQUIRES A NEW SITE PLAN REVIEW AND APPROVAL DUE TO ADDITIONAL PARKING REQUIREMENTS. LOT APPEARS TO HAVE 25 SPACES. USE OF RIGHT OF WAY AREA AS PATIO MAY REQUIRE A TEMPORARY REVOCABLE EASEMENT PERMIT DUE TO ROW AREA GIVEN TO CITY UNDER EMINENT DOMAIN PER "FINAL ORDER OF CONDEMATION" RECORDED 8/7/2003 DOCKET 12109 PAGE 476. PROPERTY IS IN NON COMPLIANCE OF PREVIOUS ENFORCEMENT OF THIS SAME VIOLATION UNDER CASE T04ZV00335. TWO SIGNS ARE POSTED ON NORTH RIGHT OF WAY - "ADDITIONAL PARKING AVAILABLE". FESTOON LIGHTS INSTALLED ON FRONT (EAST) RIGHT OF WAY AREA USED AS PATIO. ORIGINAL ELECTRICAL PERMIT T05EL00551 FOR THESE LIGHTS IS EXPIRED AND NOT FINALIZED. PERMIT LAST STATES TO "SUBMIT PLAN WITH DETAILS FOR THE OPEN WIRING AND FESTOON LITES OVER OPEN PATIO". |