Case: T08DV04986

Parcel: 116127050

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
10/31/2008 INSP - FOLLOW UP CODE ENFORCE Approved Interior of structure cleaned. Only flooring remains incomplete. All other issues on NOV abated. Both bedroom porches completed under permit. Permit finaled. Exterior premises remain cleaned. Only 2 JMVs, parts remain in rear, out of site. Supervisor gave approval to remove signage and close case. DNR has no further issues with this case. Close.
09/26/2008 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, DOORS HAD ALL BEEN REPLACED, ALL DRYWALL REPAIRED AND ENTIRE HOUSE HAS BEEN TEXTURED, BATH TUB REPLACED AND BEING RETILED BATH FLOOR BEING RETILED, WORK BEING DONE IN ADDITION TO COMPLETE THTE PERMIT PROCESS. WILL FOLLOW UP ON 10-29-08.
08/18/2008 INSP - FOLLOW UP CODE ENFORCE Approved MET WITH CONTRACTOR. FOUND INTERIOR 75% CLEANED AND NEW DOORS. CARPORT STRUCTURE REMOVED. NEW ADDITION NEAR READY FOR INSPECITON. EXPLAINED TO CONTRACTOR THE REMAINDER OF WHAT NEEDED TO BE DONE TO THE INTERIOR TO ABATE VIOLATIONS. F/UP 10 DAYS
07/21/2008 INSP - FOLLOW UP CODE ENFORCE Approved RECEIVED CALL FROM LIZ THAT HOUSE WAS BROKEN INTO BUT THAT DOORS HAD BEEN SECURED. NOTIFIED TPD (EMAIL IN CASE PACKET) ASKED IF THEY COULD GO ON PROPERTY TODAY TO REMOVE REMAINING VEHICLES. THEY WERE GIVEN THE OK. STOPPED BY PROPERTY AND CONFIRMED ALL OPENINGS WERE SECURED.
07/15/2008 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, FOUND FRONT YARD, PORCH AND CARPORT HAD BEEN CLEANED TRASH REMOVED; EAST SIDE YARD CLEANED ALL TRASH & DEBRIS REMOVED, WANTED ITEMS NEATLY STACKED UNDER PORCH. WEST SIDE YARD ALSO CLEANED TRASH & DEBRIS REMOVED. APPROX 11 CARS REMOVED FROM THE PROPERTY, MAJORITY OF TIRES REMOVED AND TRASH & DEBRIS REMOVED FROM REAR YARD, A LOT STILL REMAINS BUT MUCH PROGRESS MADE. BOARDS WERE REMOVED FROM DOORS AND KEY DEADBOLTS NOW IN PLACE. INTERIOR IN PROCESS OF BEING CLEANED. THERE IS PROBABLY 1 1/2 TO 2 MONTHS WORTH OF WORK REMAINING BEFORE WORK BEGINS TO REHAB THE INTERIOR OF STRUCTURE BUT MUCH PROGRESS MADE OVERALL.