Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T08DV02595

Parcel: 10320084B

Inspection Status: Follow-up inspection

Inspection History: NPO(EL)-MAIN/PANEL/SUB/DISCONT

Date Description Inspector Results Comments
03/28/2008 NPO(EL)-MAIN/PANEL/SUB/DISCONT Follow-up inspection BISITED SITE, MET WITH MANAGEMENT, FOUND SPRINKLER SYSTEM BACK UP AND RUNNING. DRY WALL CUT AT BASE BOARD AND SECTIONED AREAS OF WALLS AND CEILINGS REMOVED IN THOSE AREAS. WET CARPET AND FLOORING REMIVED AND DRYERS IN ALL APTS. TOLD MANAGEMENT IT WOULD BE OK TO TURN POWER BACK ONTO UNITS. i TURNED POWER BACK ON AT DISCONNECTS AND THEN TURNED POWER BACK ON AT THE SUB-PANELS. CHECKED SWITCHED - FOUND NO PROBLEM. COMPLIANT CLOSE CASE
03/28/2008 NPO(EL)-MAIN/PANEL/SUB/DISCONT Item closed
03/27/2008 NPO(EL)-MAIN/PANEL/SUB/DISCONT Initial inspection VISITED SITE, APTS 1012, 1022, 1032 FOUND SPRINKLER HEAD BROKE OFF, FLOODED TOP UNIT, WATER WORKED ITS WAY DOWN TO BOTTOM UNIT EVENTUALLY FLOODING ALL (3) UNITS. MANAGEMENT HAD SITUATION WELL HANDLED, WORK WAS ALREADY IN PROGRESS. SEE EMERGENCY CHECKLIST IN SIRE.
03/27/2008 NPO(EL)-MAIN/PANEL/SUB/DISCONT Item initialized