Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
03/01/2008 INSP - INITIAL CODE ENFORCMENT Approved ARRIVED ON SITE MET TEP WHO MENTIONED THEY WERE IN THE PROCESS OF CUTTING SECONDARY POWER. MENTIONED THEY WOULD BE CUTTING POWER AT THE POLE AND REMOVING THE METER.

MET WITH S/W GAS WHO MENTIONED GAS WAS OFF AT THE METER WHEN THEY ARRIVED AND FOUND NO TRACES OF GAS AROUND THE BUILDING.
MET WITH TFD BATTALION CHIEF WHO ASKED I WALK THE PERIMETER OF STRUCTURE. ROOF WAS 95% GONE & COLLAPSED INSIDE THE STRUCTURE, SMALL SECTION OF ROOF REMAINED BUT BADLY BURNED. EXTERIOR WALLS WERE 2X8 FRAME STUCCO AND REMAINED INTACT BUT BADLY COMPROMISED BY THE FIRE.

DBL CHECKED THE STRUCTURE FOUND REAR OR WEST BEARING WALL OF THE STRUCTURE WAS BADLY BOWED IN THE CENTER. TFD JEFF LEACH ALLOWED ENTRY INTO THE STRUCTURE FOUND (3) WALL RUNNING EAST & WEST OFF THE BACK WALL THAT LEADS ME TO BELIEVE THAT THOSE WALLS WILL HELP SUPPORT THE REAR FROM COLLAPSE. THOSE WALLS DID HAVE STUDS, THAT WERE INTACT ALLOWING TFD TO CONDUCT AN INSPECTION OF THE SOUTH HALF OF THE STRUCTURE. MY INSPECTION WAS REVISED AND INFORMATION WAS RELAYED TO BATTALION CHIEF RAY ALLEN.