Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/28/2009 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
RECEIVED CALL FROM OWNER THAT BURNED PORTION OF HOSUE REPAIRED UNDER PERMIT T08CM02129, HAD BEEN INPECTED AND FINALED. REINSPECTED PROEPRTY AND FOUND STRUCTURE COMPLETED, REMOVED DO NOT ENTER STICKER, COMPLIANT. CLOSE CASE |
| 09/08/2009 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
WORK ON FIRE DAMAGED PORTION OF STRUCTURE AND NEW ADDITION COMPLETED, PERMITS T08DV02159 AND T08CM01007 SHOW WORK HAS BEEN COMPLETED AND CASE CAN BE CLOSED |
| 06/25/2009 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
CHECKED PERMITS PLUS. 13 OF 24 INSPECTIONS HAVE BEEN APPROVED BETWEEN THE ADDITION AND FIRE REPAIR WORK. PERMIT WILL NOT EXPIRE UNTIL 12/07/09. SCHEDULE 90 DAY F/U |
| 03/30/2009 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
EXTERIOR WALL AND ROOF COMPLETE FOR ADDITION. INTERMEDIATES COMPLETE FOR ADDITION AND EXISTING HOUSE. HOUSE STOCKED WITH DRYWALL READY TO DRYWALL. WILL CHK PERMITS PLUS. ALL WORK BEING COMPLETED UNDER PERMIT T08CM01007 NOV AT DSD PERMIT ISSU. PLACE IN OBSERVE STATUS WITH 90 DAY F/U |
| 12/12/2008 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Addition under construction and interior framing, plumbing and electrical started. Exterior block and roof framing completed. Follow-up on 3/30/2009. |
| 09/16/2008 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
FOUND HOUSE IN SAME CONDITION. ALSO FOUND FOOTINGS IN REAR FOUR POSSIBLE ADDITION. ATTEMPTED CONTACTING OWNER - LEFT MESSAGE. WILL RESEARCH PERMITS + FOR PERMITS. T08CM01007 (FIRE DAMAGE/INTERIOR DEMO) ONLY. |
| 06/16/2008 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
FOUND PERMITS POSTED ON FRONT DOOR. ALL DRYWALL REMOVED. ELECTRICAL, PLUMBING AND WALLS ARE BEING REPAIRED. WORK BEING DONE UNDER PERMIT. F/U IN 90 DAYS. |
| 03/07/2008 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
VISITED SITE SPOKE WITH OWNER GEORGE LOVEGREEN WHO MENTIONED HE HAD JUST MET WITH STATE FARM INS AND IS STILL IN THE PROCESS OF GETTING 3 BIDS. MENTIONED ALL FURNITURE AND CARPETING HAD BEEN REMOVED FROM THE INTERIOR OF THE HOUSE AND WHEN THAT WAS DONE FOUND POSSIBLE ASBESTOS TO BE ON THE FLOOR AND IS HAVING THE TILE TESTED. MR LEVEGREEN HAD MANY QUESTIONS ABOUT THE PLANS AND PERMITING PROCESS. I TRIED TO EXPLAIN HOW THE PROCESS WORKS AND HOW OUR CASE COINCIDES WITH THE CASE THAT WILL BE OPENED AT DSD. I EXPECT THAT THERE WILL BE NO REAL SIGNS OF PROGRESS IN THE IMMEDIATE FUTURE; HOWEVER OWNER IS TAKING THE CORRECT STEPS TO GET A CONTRACTOR, SECURE PLANS AND PERMITS SO THAT WORK CAN GET STARTED, THEREFORE, A REINSPECTION WILL BE SCHEDULED FOR 90 DAYS OUT. |