Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T08DV00025

Parcel: 111060820

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
01/02/2008 INSP - INITIAL CODE ENFORCMENT Approved VISITED SITE, TOOK PICTURES, CARPORT SOUTH SIDE OF MAIN STRUCTURE SHOWS OVERFLOW SEWAGE FROM MAIN DWELLING. REAR YARD SHOWS OVERFLOW SEWAGE, HUMAN WASTE, TOILET PAPER ON GROUND, CAST IRON PIPE COMING FROM STRUCTURE. CAST IRON PIPE TURNS OUT TO BE CLEAN OUT. ALL PROP PLUMBING 325-8681 HAS BEEN ON SITE, LEFT FOR PARTS, RETURNED WHILE INSP. ON SITE. APPEARS STRUCTURE LINE PLUGGED UP. WHEN USING TOILET, ALL WOULD BACKUP AND COME OUT OF END OF CLEAN OUT, ALL PRO RAN SNAKE THROUGH LINE. CLEARED LINE. ALSO WILL PUT CAP ON CLEAN OUT LINE. ISSUE/HAZARD ABATED, CLEAN UP AND DISINFECTANT STILL TO TAKE PLACE.

TENANT CAME HOME, FLUSHES TOILER AND RAN WATER IN BATHTUB. PLUMBER OK'D HCS, CLEANOUT, ECT. TENANT BEGAN CLEANUP WITH BLEACH. CASE CLOSED.