Permit: T08CM04020

Parcel: 12810076B


Addresses:

384 S WILLIAMS BL


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T08CM04020

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
09/15/2011 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
08/08/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) 1ST LEVEL FLANGES OK
07/29/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
07/28/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 2ND, 3RD AND 4TH LEVEL ALL AREA CLOSET FLANGES OK (ONLY)
07/19/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/12/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
07/08/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 4TH LEVEL NORTH CLOSET FLANGES OK
2) 2" PIPING FOR ELEVATOR SUMP OK
06/30/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) DIRECT CONNECTION 3-COMP SINK OK
06/28/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 1ST LEVEL WEST WING CLOSET FLANGES OK
06/22/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 3RD & 2ND LEVEL WEST WING ONLY CLOSET FLANGES
06/20/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) (2) SHOWER PANS OK
2) INSTALL OF HAMMER ARRESTORS OK
3) SEE SECTION 704.3 FOR DIRECT CONNECTION OF 2 OF 3 COMPARTMEBNTS OF 3 COMP SINK AND SECTION 801. OF 2006 UPC
06/08/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) PROVIDE DRAINAGE FOR 3 COMP SINK
2) PROVIDE WATER HAMMER ARRESTORS FOR FLUSH VALVES
3) DWV AND WATER DISTRIBUTION ENTIRE BLDG OK
4) NEED TO SEE CLOSET FLANGES
06/07/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) CANCELLED
06/06/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :* PROVIDE WATER TEST ON DWV, REPAIR LEAKS, HAVE WATER PIPING ENERGIZED TO ALL AREAS
05/23/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 4TH LEVEL ROOMS OK, EXCEPT CLOSET FLANGES
2) 2ND AND 3RD LEVEL ROOMS OK, EXCEPT CLOSET FLANGES
3) 1ST LEVEL DWV MECH ROOM OK
05/19/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 4TH LEVEL DWV AND WATER ALL EXCEPT SINKS AT 440 &441
2) 3RD LEVEL DWV AND WATER ALL EXCEPT TUB DRAIN SUPPORTS
3) 2ND LEVEL DWV AND WATER ALL EXCEPT 221, 237 TUB DRAINS AND ? TUB VENT, 227-229 VENT FOR LAV
4) 124 & ABOVE SHEARWALL OK FOR PLUMBING
05/18/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
05/17/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) ROOM UNITS WATER DISTRIBUTION WITH MAINS OK TO INSULATE
2) NEED TO SEE WATER HEATERS, LAUNDRY, COMMON AREA OF 1ST LEVEL WATER
05/16/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) CANCELED
05/12/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) UNITS #318, 218, 118 WEST AND SOUTH TO SOUTH WEST END OF BLDG INTERMEDIATE THESE UNITS ONLY APPROVED
05/06/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) TUB 116 OK DWV LEVEL THRU 1 TO 3, WATER DISTRIBUTION LEVEL 1 THRU 3 FROM STUDIO #110 KITCHEN-WEST AND SOUTH PER INITAL PAGE P1.1
2) PROVIDE INSULATION HOT AND HOT RETURN PIPIING PER 2006 I.E.C.C. REQUIREMENTS
3) PLEASE PROVIDE A WATER ISOMETRIC FOR BACK TO BACK WATER DISTRIBUTION FOR 4 STORY DETAIL 2 P4.0 IS ONLY 3 STORY
05/05/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) PROVIDE FULL SIZE PIPING PER WATER ISOMETRIC
2) PROVIDE CORRECT TRANSITION FOR CPVC TO PEX (MOLDED THREADED FITTINGS)
3) PROVIDE LETTER FROM ENGINEER GIVING OK FOR 3" CPVC IN PLACE OF SPEC COPPER
4) UNIT 210 VALVE, 101 METER BOX 209 VALVE BACKING, SUPPORT ALL OVER HEAD CORRECTLY, ISOLATE CPVC FROM METAL SHARP EDGES
04/29/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/22/2011 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/21/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
04/18/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
03/30/2011 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*