Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* WATER TEST TO INTERCEPTOR AND BACK TO BLD. DRAIN OK INTERCEPTOR VENT REQUIRED TO TERMINATE 1' MINIMUM FROM BLD. SIDE WALL 10' AFF MINIMUM RECEIVED OK FOR 750 GALLON INTERCEPTOR |
|
| 03/25/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/18/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* NOTE #1 FOR GREASE INTERCEPTOR TEST OK NOTE #2 CONTRACTOR TO PROVIDE STAMPED SEALED LETTER FOR CHANGE ON INTERCEPTOR FROM ENGINEER |
|
| 03/16/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST THRU ROOF DWV OK WATER TEST 3" GW OK TO EXTERIOR 2' PIPE WRAPS AND TRAP PRIMERS OK 1. 4" OUTLET FROM GREASE INTERCEPTOR TO MEET DRAINAGE ELEVATION FOR INTERCEPTOR BACK INTO BLD. CONNECTION TO BUILDING DRAIN. 2. INTERCEPTOR SHALL MEET REQUIREMENTS PER PLAN |