Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2010 | PLUMBING - ROUGH, SOIL | Approved | ||
| 12/29/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE ALL INSPECTION LISTS AND NOTES |
|
| 05/06/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST FROM 2' BLD. EXTERIOR THRU BLD. OK CORRECTION TO MOP SINK UPPER TERMINAL CLEANOUT OK PROVIDE ENGINEER OK FOR MATERIAL TYPE CHANGE FOR SANITARY DRAINAGE PIPING. |
|
| 05/05/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE FULL SIZE CLEANOUT FOR MOP SINK 2. ONE 90 DEG. WITH 4' OF COPPER 3. PROVIDE NO HUB PIPING PER SPEC. |
|
| 05/04/2009 | PLUMBING - ROUGH, SOIL | Cancelled | CANCELLED PER CONTRACTOR CLIFF OF 4 L CONST. #975-6195 | |
| 05/04/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |