Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/27/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/06/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* NEED REV. FOR ADDED MOP SINK |
|
| 01/28/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. PIPING MODIFICATION RATHER THAN SYSTEM REPLACEMENT AS INDICATED ON PLAN IS OK PER STANLEY D. ADAMS 2. PROVIDE REV. FOR MS 3. INSTALL COPPER TO MIN. STANDARDS 4. REAM ALL JOINTS |
|
| 01/26/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. DWV W/TEST THRU ROOF 2. PLAN INDICATES ALL NEW PIPING WITH ONE CONN. TO EXISTING. 3. YOU HAVE LEFT MUCH OF THE EXISTING PIPING IN PLACE AND INSTALLED 16 TRANSITION FITTINGS AND OTHER OFFSET FITTINGS, MANY OF WHICH DO NOT HAVE A TEST ON THEM. 4. PROVIDE APPROVAL FROM YOUR ARCHITECT FOR THIS INSTALLATION AND REDLINE THIS CHANGE AS AS YOUR ADDITIONAL MS |