Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T08CM03955
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2009 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/10/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* PROVIDE HANGERS IN ALIGNMENT WITH PIPING, AT CORRECT INTERVALS FOR VENT & WATER SYSTEM - SEAL INSULATION INSTALL CLOSET FLANGES PER INSTALLATION STANDARD 2006 UPC |
|
| 04/20/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 04/17/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* IN WALL DWV AND WATER WITH TEST THRU ROOF OK 1. RECALL FOR CORRECT CLOSET FLANGE INSPECTION PRIOR TO SETTING STOOLS 2. PROVIDE SUPPORT AT CORRECT INTERVALS FOR ABOVE CEILING PIPING 3. ABOVE CEILING INSULATION TO BE SEALED CORRECTLY 4. VACUUM AIR SYSTEM TO BE 3RD PARTY INSPECTED |
|
| 04/16/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PROVIDE APPROVED SUPPORT IN WALLS 2. ADD SUPPORT ABOVE CEILING |
|
| 04/02/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* THIS INSPECTION 03005 - - NOT READY 1. VENT FOR FLOOR SINK TO BE INSTALLED AT ABOVE CENTER LINE OF DRAIN FOR THIS APPLICATION 2. CLEANOUT FOR STOOL IS REQUIRED TO BE ACCESSIBLE WITHOUT REMOVAL OF STOOL 3. PROVIDE REDLINE OF YOUR DRAINAGE SYSTEM ON SITE AT TIME OF INSPECTION OR INSTALL PER APPROVED PLAN. 4. YOUR COMPRESSED AIR SYSTEM DOES NOT MEET PLAN SPEC. AND 2005 NFPA 99-C REQUIREMENTS |