Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* TEST ON SYSTEM OK LEFT GAS CARD AT METER INSTALL ALL GAS APPLIANCE SHUT OFF VALVES, RECONNECT ANSUL VALVE PULL SYSTEM, PROVIDE APPROVED GAS FLEXES AND ATTACH SAFETY CABLES FOR APPLIANCES ON WHEELS. RECALL FOR FINAL PLUMBING INSPECTION WHEN ALL APPLIANCES ARE CONNECTED. |
|
| 03/11/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOT HOLDING 10 PSI DOWN TO 7 PSI |
|
| 03/03/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* CONSULT WITH ERMA VIA PHONE (ERMA @ 909-6005) |
|
| 03/02/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* CANCELED PER BELINDA |
|
| 02/25/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* TEST MUST HOLD WITH NO LOSS OF PRESSURE |
|
| 02/23/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL GAS PIPING PER SIZING ON PLAN 2. INSTALL ALL APPLIANCE SHUT OFF VALVES AND PROVIDE TEST ON ENTIRE GAS SYSTEM WITH TEST GAUGE IN 1/10 POUND INCREMENTS. TEST TO HOLD WITH NO LOSS OF PRESSURE. 3. WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN TO HAVE 1" AIR GAP AT RECEPTOR 4. WATER HEATER REQUIRES A DRAFT HOOD WITH CORRECT VENT CONNECTORS AND VENT THRU ROOF TO BE IN CORRECT DIRECTION OF FLOW |