Permit: T08CM03924

Parcel: 13418113C

Inspection Status: Approved

Inspection History: PLUMBING - MEDICAL GAS/TEST

Date Description Inspector Results Comments
08/11/2009 PLUMBING - MEDICAL GAS/TEST Approved IVRS - Inspection :*
08/06/2009 PLUMBING - MEDICAL GAS/TEST Not ready for Inspection IVRS - Inspection :*
1) LOW PRESSURE TEST IN PLACE
08/04/2009 PLUMBING - MEDICAL GAS/TEST Partial Approval IVRS - Inspection :*
1) WORKING IN DENTAL ROOM INSTALLING PIPING TO CEILING OUTLETS
08/03/2009 PLUMBING - MEDICAL GAS/TEST Partial Approval IVRS - Inspection :*
1) INSTALLING OUTLETS FOR SURGERY ROOM (2)
06/30/2009 PLUMBING - MEDICAL GAS/TEST Partial Approval IVRS - Inspection :*
1) LABELING AND SUPPORTS OK
2) NEED TO SEE FINAL CONNECTIONS, VERIFICATION OF TESTING AND 3RD PARTY CERTIFICATION AT LATER DATE
06/29/2009 PLUMBING - MEDICAL GAS/TEST Partial Approval IVRS - Inspection :*
10 02 AND WG TO OVERHEAD WITH 150 PSI TEST ? SUPPORTS OK
2) PROVIDE LABELING AND COMPLETE TO OUTLETS AFTER 3RD PARTY OK ON TESTING
06/26/2009 PLUMBING - MEDICAL GAS/TEST Partial Approval IVRS - Inspection :*
1) PIPING ON WA SYSTEM, ALL PIPING TO CAPS AT OVERHEAD SET UP FOR PURGE AND BRAZING TO BEGIN
06/25/2009 PLUMBING - MEDICAL GAS/TEST Partial Approval IVRS - Inspection :*
O2 PIPING INSTALLED WITH CAPS (4) LOCATIONS AT OVERHEADS WITH 150 PSI TEST IN PLACE

NOTE: PER THE PRE-CON MEETING HAVE DAILY INSPECTION THROUGHOUT THE INSTALLATION PROCESS
06/22/2009 PLUMBING - MEDICAL GAS/TEST Partial Approval IVRS - Inspection :*
APPROVED MATERIALS AND SUPPORTS & SUPPLIES ON SITE
PROVIDE REDLINES FOR ALL CHANGES WITH C.O.T APPROVED PLAN TO FOLLOW ON SITE