Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2010 | REINFORCED MASONRY PRE-GROUT | Approved | ||
| 10/20/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* 1) WILL RECALL |
|
| 10/16/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 3-CARPORT CMU COLUMNS FROM 0' TO 4'-8" AFFE-OK TO GROUT NOTE: 1) PER SHEET #S.2-SPECIAL INSPECTION ITEM #1 CALLS OUT FOR A POST TENSION SLAB ON GRADE SPECIAL THIRD PARTY INSPECTION TO HAVE BEEN CONDUCTED. DO NOT PROCEED WITHOUT THIS INSPECTION HAVING BEEN CONDUCTED, AS PER IBC CHAPTER #17 |
|
| 10/15/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* |