Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2009 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 09/03/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1. SECURE CLOSET FLANGE TO FLOOR 2. RECALL FOR INSP. 3. INSTALL A TEMPORARY PLUG IN OPEN SEWER PIPE FOR SAFETY IN THIS OPEN RESTAURANT! |
|
| 07/24/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DWV TEST THRU ROOF-OK 2) PROVIDE SUPPORTS ON ABS ABV CEILINGS PER T-3 3) PAINT VTR FOR UV PROTECTION 4) PLAN SPECS CONCEALED ARM CARRIER 5) CLOSET FLANGE REQUIRES INSPECTION AFTER FF 6) HARD DRAWN COPPER SPECIFIED 7) TO MANY FIXTURES PM 1/2" TUBING AT CONNECTION TO EXISTING. PROVIDE A CONNECTION TO A MINIMUM 3/4" LINE 8) INSULATION SPECIFIED |