Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T08CM03840

Parcel: 12617138B


Addresses:

787 S ALVERNON WY

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
07/02/2009 PLUMBING - FINAL Approved IVRS - Inspection :*
06/04/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. CREATE A 1" AIR GAP AT T&P DRAIN TERMINATION
2. PROVIDE RIDGID FULL SIZE PIPING FOR T&P DRAIN FOR NEW WATER HEATER
3. PROVIDE A DRIP PAN FOR NEW WATER HEATER ON PLATFORM SUBJECT TO DAMAGE
4. PROVIDE STRUCTURAL SUPPORT FOR WATER HEATER
THAT IS NOW LEANING
5. PROVIDE CORRECT SUPPORTS FOR RELOCATED HOT WATER RETURN IN MECH ROOM, REPAIR INSULATION, MAKE PUMP FUNCTIONAL
6. PROVIDE A TEMPERING VALVE AT PUBLIC USE RESTROOMS
LAV TO CONTROL HOT WATER TEMPERATURE TO MAXIMUM
OF 110 DEG.
05/15/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
PROVIDE STERILIZATION
WILL REINSPECT HW PIPING WHICH IS BEING MOVED
RECONNECT PIPING AT FLOOR DRAIN VENT
CORRECT URINAL DRAIN, TRANSITION GLUE NOT LISTED FOR INSIDE BUILDING
05/14/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) CLOSET FLANGES OK