Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/04/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CREATE A 1" AIR GAP AT T&P DRAIN TERMINATION 2. PROVIDE RIDGID FULL SIZE PIPING FOR T&P DRAIN FOR NEW WATER HEATER 3. PROVIDE A DRIP PAN FOR NEW WATER HEATER ON PLATFORM SUBJECT TO DAMAGE 4. PROVIDE STRUCTURAL SUPPORT FOR WATER HEATER THAT IS NOW LEANING 5. PROVIDE CORRECT SUPPORTS FOR RELOCATED HOT WATER RETURN IN MECH ROOM, REPAIR INSULATION, MAKE PUMP FUNCTIONAL 6. PROVIDE A TEMPERING VALVE AT PUBLIC USE RESTROOMS LAV TO CONTROL HOT WATER TEMPERATURE TO MAXIMUM OF 110 DEG. |
|
| 05/15/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PROVIDE STERILIZATION WILL REINSPECT HW PIPING WHICH IS BEING MOVED RECONNECT PIPING AT FLOOR DRAIN VENT CORRECT URINAL DRAIN, TRANSITION GLUE NOT LISTED FOR INSIDE BUILDING |
|
| 05/14/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CLOSET FLANGES OK |