| 05/15/2009 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/08/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. INSULATION OK 2. HAVE CLOSET FLANGE INSPECTED PRIOR TO SETTING OF STOOLS |
|
| 04/30/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* DWV THRU ROOF OK WATER DISTRIBUTION OK 1. NEED TO SEE CORRECT CLOSET FLANGE INSTALLATION PRIOR TO SETTING STOOLS 2. INSULATE PIPING PER PLAN PO.2, 2.2 |
|
| 04/29/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* SOUTH RESTROOM IN WALL OK 1. SUPPORT OVERHEAD PIPING AT CHANGES OF DIRECTION AND AT CORRECT INTERVALS 2. PROVIDE 2" PERM CAP ON WATER AT THIS RESTROOM SOUTHEAST CORNER ABOVE CEILING 3. NORTH RESTROOM IN WALL OK. RETEST AFTER REPAIR ON VENT ABOVE CEILING 4. PROVIDE HANGERS AT CORRECT INTERVALS ON ALL PIPING THIS RESTROOM 5. PROVIDE CORRECT DRAINAGE FITTINGS FOR EWC DRAIN WITH TEST |
|
| 03/10/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. INSTALL PER APPROVED PLAN AND SPEC 2. UNDERGROUND IN WOMENS RESTROOM WITH ABS TEST OK WITH LETTER 3. ADD SUPPORT IN WALLS |