Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2009 | ENGINEERING - FINAL | Approved | ||
| 08/04/2009 | ENGINEERING - FINAL | Not ready for Inspection | 1) COMPLETE HC RAMP 2) CLEAN OUT ASPHALT IN FRONT OF DRAIN PIPES IN PARKING LOT. 3) INSTALL ALL SPLASH BLOCKS FOR ROOFDRAINS (DOWN SPOUTS). 4) REMOVE ALL CONSTRUCTION DEBRIS, MATERIAL AND EQUIPMENT. CALL FOR RE-INSP. |
|
| 07/28/2009 | ENGINEERING - FINAL | Not ready for Inspection | COMPLETE ALL SITE WORK, CALL FOR RE-INSPECTION |