Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2009 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* OK FOR CEILING TILES |
|
| 03/26/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 03/24/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1. DO NOT OVAL THE RETURN AIR CONNECTION TO THE CEILING PLENUM BOX. SIDE TAP AS PER PLANS. 2. PROVIDE PLENUMS ON SUPPLY DIFFUSERS AS PER PLANS. 3. PROVIDE A LETTER FROM ENGINEER IF CHANGING ANY DETAILS 4. CHECKED CONDENSATE DRAINS STEP UP TO 1" AT 1ST TEE AT UNIT #7 -- ALL OTHERS OK |
|
| 01/21/2009 | MECHANICAL - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* |