Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/08/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CALL IN SITE SEWER PERMIT FOR APPROVAL 2) TERMINATE FUTURE SINK AREA CLEANOUT AND DRAIN STUB PROPERLY 3) TERMINATE T & P DRAIN WITH 1" AIR GAP 4) INSTALL WATER HEATER PIPING PER PLAN 5) CALL IN 03040 AND EXPOSE INLET TO BLDG 6) INSTALL FIXTURES PER 15.6 STERILIZATION AND BACTERIA REPORT ON SITE |
|
| 07/01/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE ALL PLUMBING, HAVE ALL FIXTURES FUNCTIONAL. PROVIDE STERILIZATION AND BACTERIA REPORT FOR POTABLE WATER |