Permit: T08CM03626

Parcel: 136244460

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
07/07/2009 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
05/13/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 2-LIGHT POLE BASES AT NORTH PARKING LOT
2) SPECIAL INSPECTION PERFORMED BY TERRACON
03/23/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT @ 3 TRASH ENCLOSURE FOOTINGS OK
03/20/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT @ CMU SOUTH SIDE RETAINING/SITE WALL FROM 0' TO 5'4" ABOVE T.O.F -- OK TO GROUT
03/11/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT @ SOUTH SITE WALL FOOTING OK
03/02/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RETAINING WALL FOOTING @ N.W.C OF BLDG. -- OK
02/27/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RETAINING WALL FOOTING ADJACENT TO NW CORNER OF BLDG. 2
02/26/2009 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
MISSING 4 LOWER #4 CONTINUOUS BARS
02/25/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NORTH, EAST AND WEST SIDES OF NORTH PARKING SPACES CONTINUOUS FOOTINGS REINFORCEMENT STEEL @ WEST SIDE OF NORTH ENTRANCE OK - SPECIAL INSPECTED
02/20/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RADIUS WALL FOOTINGS @ NORTH CENTRAL; NORTHWEST AND SOUTHEAST W/COLUMN FOOTINGS @ N/W & S/E RADIUS FOOTINGS - OK - SPECIAL INSPECTED
02/19/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS EXTERIOR WALL FOOTINGS AT GRID B/2.5 TO 4.5
4.5/A TO B - 2.5/B TO B.5 - B/7.5 TO 12 - 12/B TO D.8 AND
D.8/9.5 TO 12 AND COLUMN FOOTINGS @ A/6, 8 & 10
SPECIAL INSPECTED
02/18/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ CONTINUOUS EXTERIOR WALL FOOTING @ 1/B.5 TO E & E/1 TO 9.7 AND COLUMN FOOTINGS @ C AND D/3, 4, 5, 7 AND 9 - SPECIAL INSPECTED