Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/19/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* BELOW FLOOR PIPING W/TEST OK IF ENGINEER APPROVES MATERIAL CHANGE SEE SPEC 15415 INSTALL ABV SLAB TEST FITTINGS AND OR MAKE OTHER PROVISIONS AND RETEST SO THAT NO JOINT GOES UNTESTED INSTALL P1 TO C1 TRANSITION COUPLINGS IF USING CASTIRON ABV FLOOR |