Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T08CM03574
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/04/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
11/30/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) PROVIDE AN ACCURATE CITY APPROVED REVISION OR INSTALL WATER SERVICE PIPING PER PLAN WHICH INDICATES 3" 2) COMPLETE MECH ROOM; INSULATION, INSTALL GAS LOCK AT GAUGE, EXCEPT T PIPING 3) PROVIDE ALL BACKFLOW CERTS |
|
11/20/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) INTERIOR CORRECTIONS, LABELS OK AND CLEANOUTS OK 2) COMPLETE WORK IN MECH ROOM AND ROOF 3) TEST ON 6" RWL, NEEDS SUPPORTS. CANNOT APPROVE UNTIL PLAN REV. |
|
11/17/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) 1" CONN TO IRR ASSEMBLY OK 2) CERT REQUIRED AFTER REWORK 3) PROVIDE APPROVED PLAN FOR SIZING OF NEW WATER SYSTEM AND BACKFLOW DEVICES |
|
11/06/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BEFORE HOURS INSPECTION REQUESTED BY JOHN WITH JACKSON DEAN, PAID WITH CHECK #4073 2) LEAK AT T & P VALVES 3) SUPPORT PVC WASTE PIPING AT BACKFLOW HAZARD AT POWER SOAK FOR ROTIS 4) HOSE END MAY NOT GO BELOW FLOOD LEVEL WITHOUT HIGH HARD PROTECTION 5) AAV MAY NOT HAVE A VALVE ON STREAM 6) SUPPORT WATER LINES ABOVE CEILING 7) REMOVE OR SUPPORT DEMO PIPE LABELS IN ALL AREAS 8) YOU HAVE A HIGH HAZARD CROSS CONNECTION AT BATT FILL, CORRECT WITH RP IMMEDIATELY 9) LABEL NON POTABLE AND PROVIDE CONN TO PROPERLY SIZED SUPPLY 10) CAP FIXTURES REMOVED-ALSO CHECK CO PLUGS RECEIVING 11) NOTE CONTINUED DENIED INSPECTIONS MAY RESULT IN REINSPECTION FEES 12) NOT A COMPLETE FINAL INSPECTION |
|
11/04/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NEED TO COMPLETE OR ADDRESS ALL OUTSTANDING ISSUES 2) PROVIDE REVISIONS AND DOCUMENTATION REQUESTED IE...RWLS AND WATER PIPING CHANGES. LETTERS AND BACKFLOW CERTS 3) PIPING AT BLDG SERVICE AND IRR ASSEMBLY WAS COVERED WITHOUT INSPECTION 4) NEED TO INSPECT WORK COMPLETED (AT DELI AND MEAT DEPTS) AFTER LAST INSPECTION AS DISCUSSED I NEED SAFE ACCESS TO THESE LOCATIONS 5) NEED TO REINSPECT CLEANOUTS, ALSO INSULATION AND SUPPORTS ABOVE CEILING |
|
10/16/2009 | PLUMBING - FINAL | Partial Approval | ||
10/15/2009 | PLUMBING - FINAL | Not ready for Inspection | 1) USE 3090 FOR FINAL INSPECTIONS 2) PROVIDE DRAINAGE FITTINGS AS REQUIRED BY CODE, ALIGN 1W PIPES SO AS NOT TO SPLASH-ALSO TRAP PRIMERS 3) ABS-PVC MAY NOT SOLVENT WELD INSIDE BLDG AT HS 4) WATER TEST ALL FIXTURES, CORRECT DRIPS, INSTALL RP AND PROVIDE CERTS 5) COMPLETE WORK AND GET INSPECTED PRIOR TO USE-YOU MAY BEGIN MOVE |
|
10/14/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL POWER WASHERS PER PLAN, PROVIDE 140' ? AS SPEC 2) CORRECT LEAKS AT CHICKEN PREP 3) COMPLETE WORK IN DELI PRIOR TO INSP. GET FINAL APPROVALS FOR PLUMBING AND ELECTRICAL PRIOR TO OCCUPYING |
|
10/13/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) MEAT PREP OK TO USE AFTER MAKING THE FOLLOWING CORRECTIONS: INDIRECT PIPING MAY NOT COMBINE. ADD CLEANOUT WITH DIRECTIONAL FITTING 2) SECURE FAUCETS AND INDIRECT WASTE PIPING |
|
10/09/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* BAKERY AREA: 1) ONLY ONE P-TRAP ALLOWED PER TRAP ARM 2) PROVIDE LISTED CLEANOUT PLUG AND SEAL THREADS 3) PROVIDE STERILIZATION PAPERWORK 4) PROVIDE LOW HAZARD PROTECTION TO WATER SUPPLY FOR OVENS |
|
10/07/2009 | PLUMBING - FINAL | Denied | 1) PROVIDE APPROVED CLEANOUT PLUGS ON 6" D1 SEWER CLEANOUTS 2) AFTER HOURS INSPECTION REQUESTED BY JOHN WITH JACKSON DEAN, PAID WITH CHECK #4070 |
|
09/04/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 1 1/2 COPPER OVER HEAD PER UNAPPROVED REV. 2) PROVIDE STERILIZATION AND BACKFLOW CERTS 3) FINAL WORK IN RECEIVING IS NOT COMPLETE |
|
09/02/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
06/26/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* |