Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T08CM03574
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/13/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
10/09/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) LOCK OUT VALVE AT ROTISSERIE AND PROVIDE PSI TEST THRU SOLENOID VALVES 2) OK TO ENERGIZE NEW GAS SYSTEM TO OVENS AND PAN WASHER ONLY |
|
10/08/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) LOW PSI TEST AT BAKERY OVENS OK, SUPPORT PIPING AT EQUIP. CONN. 2) NEED TO INSPECT WATER PIPING ABOVE CEILING, ADD SUPPORTS, INSULATION AND LABELS 3) IS BACKFLOW PROTECTION NEEDED FOR OVENS ? |
|
10/07/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) MED PSI GAS OVERHEAD TO BAKERY WITH 65 + PSI TEST OK 2) PROVIDE A LOW PSI TEST ON COMPLETION OF PIPING TO GAS EQUIPMENT, ALSO PROVIDE PIPE LABELS AS SPECIFIED IN SECTION 15050, 2.10 |
|
10/02/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) GAS PIPING IN WALL 4" DROPS IN WALL ONLY TEST OK IN ROOM #111 |
|
10/01/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
09/04/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) REQ INSPECTION TO 10 AM JOHN 425-531-1036 2) GAS TEST FOR RECEIVING AREA OK, SOAP TEST AT EXISTING CONNECTION OK 3) WATER HEATER VENT NOT INSTALLED, HAVE MECHANICAL INSP OF VENTING |
|
08/17/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) NEW GAS PIPING TO WATER HEATERS WITH TEST OK 2) PROVIDE CORRECT SIZE SUPPORTS ON PIPING 3) WILL WITNESS SOAP TEST AT TIE IN AT LATER TIME 4) EXPANSION TANK IS NOT SIZED PER PLAN DETAIL #15 |
|
08/14/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
08/13/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) SUPPORT PIPING AT WHS 2) CHECK FOR BTU RATING, HAVE MECHANICAL INSPECTION OF WH VENTING |
|
07/06/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) INSIDE BLDG SLAB ROUGH SOIL PER RED LINE DRAWING TEST OK PAGE-5.1 ON SOUTHWEST SIDE OF BLDG 2) INSTALL VALVE AT EAST WALL INSIDE BLDG PER P-1.2 TEST WITHOUT VALVE OK 3) INSTALL PER APPROVED PLANS AND PROVIDE TEST |
|
07/02/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A 60 PSI TEST FOR 24 HRS, AND ? CERTS |